Serving Duluth, Superior & nearby Minnesota and Wisconsin towns Mon–Sat 7am–6pm (715) 919-7956

Basement Finishing & Remodeling in Duluth, MN & Superior, WI

Family rooms, bedrooms and home offices built dry first, with walls insulated for cold concrete, egress windows where bedrooms need them, and a flat written quote before framing starts.

Twin Ports Contracting & Repair handles basement finishing and basement remodels in Duluth, MN and Superior, WI, from moisture checks to insulation, egress windows, drywall and flooring. National cost guides put basement finishing at about $7–$23 per sq ft, according to HomeAdvisor. That's a national range, not our price; your written quote, approved before work starts, is the real number.

Updated by Twin Ports Contracting & Repair, Duluth, MN

Finished Basements

A Finished Basement Starts With a Dry One

A basement remodel in Duluth, MN or Superior, WI can turn storage space into a family room, a guest bedroom or a home office without adding onto the house. What makes the room last happens before the first sheet of drywall: we look for water and dampness, frame walls with treated wood where they meet concrete, insulate the foundation walls in a way that suits a cold climate, and plan an egress window for any bedroom. Then the ceilings, lighting, flooring and trim turn it into a room you'll actually use in January.

Plan the layout around what has to stay reachable: the furnace, water heater, main drain cleanout and water shutoff. New lights, outlets and circuits are new electrical work, done by a licensed electrician under an electrical permit, and a room with little daylight needs more of them than you'd guess, so we lay them out with you and get the electrician in before the walls close.

On the slab, luxury vinyl plank handles damp better than laminate or solid wood; our planning range for installing LVP is $3–$7 per square foot for labor, plus the planks. Every job gets a flat price in writing you approve before work starts, and our $95 visit fee is waived when you approve the work.

What Our Basement Finishing Work Covers

  • Basement family roomsOpen living space with planned lighting and outlets
  • Basement bedroomsEgress window, closet, alarms and heat
  • Home offices and guest roomsOutlets and light where the desk goes
  • Finished basement remodelsOld paneling, ceilings and carpet replaced
  • Moisture checksWater sources found before walls go up
  • Wall framingTreated plates wherever wood meets concrete
  • Basement wall insulationFoam board on concrete, sealed rim joists
  • Egress windowsSized to code, with a proper well
  • Drywall and ceilingsAccess kept to valves, cleanouts and ducts
  • Basement flooringLVP and other floors suited to concrete
  • Lighting and outletsLicensed electrician, under an electrical permit
  • Basement bathroomsNew fixtures under a plumbing permit

Common Basement Finishing Projects

Basement Finishing project examples: compare the work included and the details to confirm before booking.
ProjectWhat's includedGood to know
Basement family roomMoisture check, framing, insulation, drywall, ceiling, flooring and trim, with lighting and outlets wired by a licensed electricianKeep the furnace, water heater and main shutoff reachable, not buried behind a wall
Basement bedroomEgress window and well, framing, insulation, closet, drywall, smoke and CO alarms, flooringPlan the egress window first, since it decides where the room can go
Basement bathroomDrain and supply lines, exhaust fan, fixtures, wall and floor finishes, lightingNeeds a plumbing permit; if the main drain leaves above the floor, a toilet needs an ejector pump
Remodel of an older finished basementTear-out of old paneling, ceiling and carpet, then new insulation, drywall, lighting and flooringOld paneling can hide fiberglass and plastic against damp concrete, so plan on new insulation

Budgeting for basement finishing work? The cost guide and its estimator show planning ranges; the price you approve comes from photos, measurements, access, materials and the finish.

For local prices, see the basement finishing cost guide.

Moisture First, Then Insulation for Cold Concrete

Water has to be solved before a wall goes up, because framing and drywall hide a damp foundation instead of fixing it. Common outside causes are clogged gutters, downspouts that empty against the house and soil that slopes toward the foundation, so check those first. Water seeping through the walls or floor is a job for a basement waterproofing contractor, and paint-on sealers aren't a cure: Minnesota's Commerce Department says interior coatings can't stop moisture from seeping through walls or floors (Home Energy Guide). It's also a good time for a radon test, which the Minnesota Department of Health recommends for every Minnesota home.

Insulating basement walls in a cold climate is mostly about keeping warm, humid room air away from cold concrete, where it condenses. The same Commerce guide says the old method of studs and fiberglass against the foundation is no longer recommended, because moisture trapped behind it can grow mold, and it recommends sealing the rim joist with cut-to-fit rigid foam rather than fiberglass. On a dry wall, we put rigid foam board against the concrete with the seams sealed, then frame a stud wall inside it on a treated bottom plate. No plastic sheeting goes over the wall, so moisture isn't trapped inside it.

Egress Windows for Basement Bedrooms

A basement egress window has to be big enough to climb out of, low enough to reach, and set in a well that lets it open all the way. For a below-grade window, Section R310 of the Minnesota Residential Code calls for at least 5 square feet of clear opening, at least 24 inches of clear height and 20 inches of clear width, and a sill no more than 44 inches above the floor. The well needs at least 9 square feet of area, 36 inches of width and projection, and a permanent ladder or steps if it's deeper than 44 inches (summarized by the City of Saint Paul).

Wisconsin sizes exit windows differently. Its Uniform Dwelling Code calls for a net clear opening of at least 20 by 24 inches in either direction and a sill no more than 60 inches above the floor, with a fixed platform under the window once the sill is higher than 46 inches, plus an areaway reaching at least 36 inches out from a below-grade window (SPS 321.03(6)). On either side of the bridge, pick a window that opens wide: a casement gives more clear opening than a slider or double-hung of the same size.

What Counts as a Finished Basement

A finished basement is space built to the same standard as the rest of the house: framed and insulated walls, a finished ceiling and floor, lighting and outlets, and heat, so it's usable all year. Painted concrete and a rug on the slab make a basement nicer, but they don't make it finished. How it's counted is a separate question. Fannie Mae requires appraisers to measure homes under the ANSI Z765 standard, and it treats a level as below grade if any part of it is below grade, however well it's finished (Fannie Mae Selling Guide).

So a walkout on a Duluth hillside that's partly below grade isn't counted in the home's above-grade square footage or room count. It still matters: the same guide says below-grade rooms may add substantially to value, and appraisers report and adjust for them on their own line. For a basement room to be a code-compliant bedroom, it also needs the egress window, floor area and alarms covered in the questions on this page. And a permitted, inspected finish is easier to show a buyer than one with no record.

Basement Finishing Contractors in Duluth and Superior: Every Step, in Order

Finishing a basement touches several trades, so the useful question when you compare basement finishing contractors is who coordinates them. We handle the framing, insulation, drywall, flooring, trim and paint in one written quote, and bring in a licensed electrician under an electrical permit for the wiring and a licensed plumber for any plumbing, so you have one contact from the moisture check to the final walkthrough. The work runs in this order.

First, prove the space stays dry through a wet season and run a radon test. Then plan the layout around the furnace, water heater, sump, floor drain and main shutoff, place any egress window, since it decides where a bedroom can go, and get the permits: the building permit, plus the licensed trades' electrical and plumbing permits. The egress opening and well get cut early. Next comes rigid foam against the foundation walls and sealed rim joists, then framing on treated bottom plates wherever wood meets concrete.

With the framing up, the rough-ins go in: wiring by a licensed electrician, plumbing for any bathroom or bar sink, and ductwork, each under its own permit. The walls stay open until those rough-in inspections pass. After that come drywall and ceilings, with access panels at valves and cleanouts, then paint, flooring, doors and trim, and the fixtures and final inspections that close out each permit. Most of the calendar is set by inspections, drying compound and material lead times rather than by the carpentry itself.

Repair, Replace or Call a Specialist? Basement Finishing Decisions

A basement has to be dry before it gets walls. Find what you see to learn whether it is ready to finish or needs a specialist first.

Basement finishing decisions: common situations in Duluth and Superior homes, the usual fix, and who does the work.
What you're seeingLikely causeUsual fixWho handles it
Water seeps through the walls or floor after rain or snowmeltGroundwater or a failed foundation drainage pathFix the water source; paint-on sealers won't stop itA waterproofing contractor
Wet along the walls, with clogged gutters or soil sloping inSurface water directed at the foundationClear gutters and extend downspouts, then watch a wet seasonUs for the gutters and downspouts
Musty smell or damp spots on a concrete wallCondensation on cold concreteSeal rim joists, put rigid foam against the concrete, then frameUs, after a moisture check
You want a bedroom, but no window is big enough to climb out ofNo egress opening in the foundation wallExcavate, cut the opening, set the window and well to codeWe coordinate the cutting and excavation, then frame and finish; expect a permit
You want new outlets and lights in the finished spaceNew circuits neededRough in the wiring before the walls closeA licensed electrician under an electrical permit
You want a bathroom, but the main drain leaves above the floorNot enough drop to the drainAdd an ejector pump and rough in the linesA licensed plumber under a plumbing permit
Wide horizontal cracks, or foundation walls bowing inwardSoil pressure moving the wallEvaluate the wall before any finishing work startsA foundation specialist or engineer

Duluth's Basement Rules and Older Stone Foundations

Duluth applies the same rules to finishing a basement as to finishing an attic: a code-compliant stairway, code-compliant headroom in the stairwell and the new space, and a window in any new habitable space for light, ventilation and egress.

The city may ask for its Window Well Form for the egress window, a new window well needs a site plan, and any wood touching concrete or masonry has to be treated or naturally decay-resistant, like cedar (City of Duluth). Many homes in Duluth's older neighborhoods sit on stone or block foundations that can let moisture through, so those walls get a close look before anything is framed against them.

Basement Finishing in Duluth, Superior and Nearby Towns

Finishing a basement runs into three things that change with the address: the headroom and egress rules, which differ between Minnesota and Wisconsin; the office that permits and inspects the work; and, outside the sewered areas, the septic rules that come into play when a bedroom is added. Here is how those play out around the Twin Ports, each rule with its source. We check what your address needs, and who has to hold each permit, before we quote.

Basement Finishing and Remodeling in Duluth, MN

Duluth treats a basement finish like an attic conversion: a code-compliant stairway, code-compliant headroom in the stairwell and the new space, and a window in any new habitable space for light, ventilation and egress. Any wood touching concrete or masonry has to be treated or naturally decay-resistant, like cedar, and a new window well needs a site plan and possibly the city's Window Well Form (City of Duluth). Minnesota sets the ceiling for an altered existing basement at 6 feet 4 inches or more, including beams, girders and ducts, with the same headroom along the stairway (Minn. R. 1309.0305).

Adding a bedroom brings its own list in Duluth: a building permit, a new smoke or CO alarm, a code-compliant egress window with documentation from the window supplier that it meets egress and energy code, and an electrical permit, which comes from the State of Minnesota (City of Duluth). On the city's steep hillside (Wikipedia), a basement can open at grade on the downhill side, but Fannie Mae's appraisal rules still treat a level as below grade if any part of it is below grade (Fannie Mae).

Finishing Basements Under Duluth's Older Houses

An estimated 43% of Duluth's housing units were built before 1940 (2025 Duluth Housing Needs Analysis), and in West Duluth likely a majority of homes predate 1939 (Wikipedia). A basement that old can hold materials worth testing before they're disturbed: the Minnesota Department of Health lists pipes, insulation, heating system products, flooring and ceiling products among asbestos materials in homes, and says a Minnesota-certified asbestos inspector has to sample them to confirm (MDH).

We don't remove asbestos; suspected material is tested and handled by a licensed abatement firm first. Duluth also requires a building permit for framing walls and installing insulation and vapor barrier (City of Duluth FAQ).

Basement Finishing in Superior, WI

Wisconsin's Uniform Dwelling Code sets a 7-foot ceiling for habitable rooms, with beams allowed 8 inches lower (SPS 321.06). Its exit windows need a net clear opening of at least 20 by 24 inches and a sill no more than 60 inches up, with a fixed platform once the sill passes 46 inches (SPS 321.03(6)), and a basement used for sleeping needs two exits (SPS 321.03(5)). The UDC governs alterations to homes begun on or after June 1, 1980 (SPS 320.03 and 320.04); for an older Superior house, ask the city's building inspection office which standard it applies.

Finishing a basement isn't on Superior's Permits Not Required list, and the city requires building permits for alterations (City of Superior). The list does exempt sealing or coating interior concrete walls and floors (City of Superior), but Minnesota's Commerce Department notes that interior coatings can't stop moisture from seeping through walls or floors (Home Energy Guide), so a coated wall still gets watched through a wet spring before anything is framed against it.

Basement Finishing in Hermantown and Proctor

Hermantown lets a replacement egress window go into the original-size opening as long as it's the same type and the largest standard opening that fits, which helps when an existing basement bedroom window wears out. Homeowners doing their own work there still need the zoning and building permits, and all electrical permits and inspections go through the state Department of Labor and Industry (City of Hermantown). New basement lighting and outlets are done by a licensed electrician under that state permit.

In Proctor, a basement bathroom's plumbing takes a plumbing permit whether the owner of an occupied home does it or a licensed plumber does, and electrical permits come from the state. Finish items like painting, floor coverings and cabinets need no building permit on their own (City of Proctor), so the permit questions in a Proctor basement sit with the framing, plumbing and wiring rather than the finishes.

Basement Bedrooms on Septic: Esko, Saginaw and Rural Townships

Outside the sewered areas, a basement bedroom can involve the septic system. Where a local government issues permits for adding a bedroom, Minnesota's septic rules call for a compliance inspection of the system on that property before the permit is issued, unless an exception in the rule applies (Minn. R. 7082.0700). Thomson Township, which covers Esko and Harney, issues building, plumbing and septic permits and runs a sewer utility, while electrical permits go to the state inspector (Town of Thomson). Ask which one serves your house before planning a bedroom.

In county-zoned townships such as Grand Lake, around Saginaw, and Fredenberg, St. Louis County does not administer the Minnesota State Building Code (St. Louis County), so no county inspector reviews a basement finish. The egress window, smoke and CO alarms and headroom still matter for a room someone sleeps in, and we plan them in either way. New wiring still needs an electrical permit, and the state's directory shows whether the state or a local office inspects your address (Minnesota DLI).

Basements in the Village of Superior and Oliver

South and west of the city, the permit office changes at each boundary. The Village of Superior lists its own building code inspector (Douglas County), and Oliver is its own incorporated village (Wikipedia), so confirm its inspector with the village. The Town of Parkland, which includes South Range and Cutter, adopted the Uniform Dwelling Code and took over inspections in 2005 (Wisconsin DSPS). Douglas County's land use permit is required before construction of any structure (Douglas County); for a finish inside an existing basement, the town or village inspector is the one to ask.

Unsure who issues permits where you live? The Minnesota and Wisconsin office lists cover each town's office, its phone number and what it exempts from a permit.

Getting a Basement Finishing Quote and How the Job Runs

What to Send for a Basement Finishing Quote

A basement quote starts with photos. Send pictures of each wall, the stairs, the ceiling with its ducts and pipes, the furnace and water heater corner, and any spot that has ever been damp, plus rough dimensions and the height under the lowest duct or beam. Tell us what the space is for: a family room, a bedroom, an office or a bathroom. We check the rest on site and give you a quote in writing with each stage of the work spelled out.

Before requesting a quote, include: Photos of the walls, stairs, ceiling and furnace area; Rough dimensions and the lowest ceiling height; How you'll use the space and any history of water. The repair-list planning guide has a simple method for gathering these details.

How a Basement Finishing Job Works

  1. Send the details. Use the quote form, or call or text (715) 919-7956, and include photos and rough measurements for the basement finishing job.
  2. Get a flat written quote. The quote is one flat price in writing, and a visit, if the job needs one, costs $95 and is waived once you approve the work.
  3. Pick a day. The schedule follows your calendar, not ours.
  4. Work done, then a walkthrough. The last step is a walkthrough of the finished basement finishing work; the workmanship is guaranteed in writing, and if it fails we return and redo it at no charge.

Basement Finishing Questions

Do I need a permit to finish a basement in Duluth or Superior?

Yes, in both cities. Duluth requires a building permit for framing walls and installing insulation, plus electrical, plumbing and HVAC permits for new wiring, fixtures and ductwork (City of Duluth; trade permits are listed under About Permits). Superior requires building permits for alterations, and finishing a basement isn't on its Permits Not Required list. Flooring, paint and trim alone need no permit in either city. For framing, egress or new plumbing, we check what your address needs, and who the office requires to pull the permit, before we quote.

How much does it cost to finish a basement?

Finishing a basement typically runs $7–$23 per sq ft, or $15,000–$75,000 for most projects, according to HomeAdvisor. A separate HomeAdvisor guide to basement remodels, meaning changes to the layout or features of a basement that's already finished, puts those at $30–$75 per sq ft. Both are national typical ranges, not our prices and not a Duluth survey. Moisture fixes, an egress window, a bathroom and the size of the space all move the number, and your written price, approved before work starts, is the real number.

Is my basement ceiling high enough to finish?

In Duluth it is if the finished ceiling will be at least 6 feet 4 inches everywhere, measured under the lowest beam, duct or soffit. That's Minnesota's minimum for finishing an existing basement, and the stairway needs the same 6 feet 4 inches of headroom along its whole length (Minn. R. 1309.0305). Wisconsin's Uniform Dwelling Code sets 7 feet for habitable rooms, with beams allowed 8 inches lower (SPS 321.06), and Superior's building inspection office can confirm which rule applies to your house.

What does a basement bedroom need to meet code?

An emergency exit, enough floor space and working alarms. In Minnesota, a basement bedroom needs an egress window, at least 70 square feet with no side under 7 feet, smoke alarms inside and outside it, a CO alarm within 10 feet and permanent heat, and it can't open straight into a furnace room unless the appliances are direct-vent or enclosed (City of Saint Paul). In Wisconsin, a basement used for sleeping needs two exits, and an egress window in each bedroom can be the second (SPS 321.03(5)).

Can you finish a basement with stone or block walls?

Often, yes, once the walls stay dry. Stone and block can let water in through mortar joints and hollow cores, so watch them through a spring thaw first. On a dry wall, we leave a gap between the framing and the stone and use treated or decay-resistant wood wherever it touches masonry. Minnesota's Commerce Department advises leaving basement walls uninsulated on the inside unless the moisture risk is very low (Home Energy Guide), so a wall that stays damp is better left open as storage or utility space.

Should a basement ceiling be drywall or a drop ceiling?

Either works, and one basement can use both. A drywall ceiling looks like the rest of the house and keeps the most headroom, so we add access panels at shutoff valves, cleanouts and duct dampers. A suspended ceiling costs a few inches of height but lifts away to reach pipes, wiring and ducts, which suits the stretch under a bathroom. Either way, the main water shutoff and anything else you'd need in a hurry stays easy to reach.

Can you add a bathroom when finishing a basement?

Yes, and the main drain decides how. Where the sewer line leaves the house below the basement floor, a licensed plumber cuts the new drains into the slab and ties them in; where it leaves above the floor, the new fixtures need a sewage ejector pump to lift waste up to it. That plumbing is done under a plumbing permit in both Duluth and Superior, and in Duluth a bathroom typically needs an HVAC permit for the exhaust fan as well. Our bathroom remodeling page covers tile, vanities and showers.

Can you remodel a basement that was finished years ago?

Yes, and the first job is finding out what's behind the old finish. Paneling and carpet from past decades commonly hide studs and fiberglass pressed against the foundation, sometimes behind plastic sheeting, an approach that's no longer recommended because it traps moisture and can grow mold. Old floor tiles, especially 9-inch squares, and some older ceiling tiles can contain asbestos, so test them before they're disturbed. From there we rebuild with current insulation, drywall, lighting and flooring, keeping sound framing and a layout that works.

How long does a basement finish take in Duluth, MN?

Plan in weeks, not days, since a permitted finish waits on each inspection before the next stage starts. The order runs plans, permit review, framing, rough-in wiring, plumbing and ductwork, inspections, insulation, drywall, then paint and flooring. Most of the waiting is in permit review, inspections and drywall compound drying between coats. The City of Superior asks applicants to allow 10 business days for review. Wiring is done by a licensed electrician under an electrical permit. The written quote spells out the schedule.

Is it worth finishing a basement?

Usually, if the basement is dry and has the headroom. Its foundation, walls and roof already exist, so national cost guides put finishing at $7–$23 per sq ft (HomeAdvisor), against $80–$210 per sq ft for a home addition (HomeAdvisor). Those are national ranges, not our prices. It isn't worth it in a basement that takes on water every spring or can't reach code headroom; fix the water first, or keep the space for storage and utilities.

What do you do with a sump pump when finishing a basement?

Keep it reachable; never bury it. The sump pit belongs in a utility room, a closet or behind an access panel big enough to lift the pump out, and the outlet it plugs into stays easy to reach. A sealed lid cuts noise and dampness, and Minnesota's health department notes that radon systems using the drain tile put covers on the sump baskets (MDH). Check where the pump discharges outside, too: it should carry water well away from the foundation.

Does finishing a basement reduce radon?

No. Framing, drywall and carpet don't stop radon. The Minnesota Department of Health says radon is lowered with a fan-driven mitigation system, and that sealing cracks makes it more efficient (MDH). MDH also says to test before and after changes like finishing a basement, and to retest after a system goes in (MDH). If you need one, install it while the walls are open; the fan can't sit in or below living space. In Superior, Wisconsin's health department recommends testing every home (WI DHS).

What inspections are needed when finishing a basement?

In Duluth, each permit brings its own inspections: the building permit covers framing and insulation, and separate electrical, plumbing and HVAC permits cover new wiring, fixtures and ductwork (City of Duluth). The rough-ins are inspected before insulation and drywall close the walls, and final inspections close out each permit. Superior requires a building permit for the alteration, plus trade permits for that work. Covering work before it's inspected can mean opening the wall back up.

Should you insulate a basement ceiling when finishing?

Not for heat in most finished basements, because the basement becomes heated living space and the floor above is already inside the house. Insulating the foundation walls and rim joists is what keeps the room warm. Sound insulation between the joists is a different matter: it quiets footsteps and a TV between floors, which suits a bedroom or office under a kitchen. Keep it clear of ducts, and leave access at valves, cleanouts and junction boxes.

What do you do with a floor drain when finishing a basement?

Leave it open, reachable and at the low point of the floor. The floor drain catches water from a water heater, a washer or a leak, so it shouldn't disappear under new flooring; frame it into a utility room if you can, or finish the floor to a clean edge around it. Keep water in its trap so sewer gas doesn't come up. Moving a floor drain or adding new ones is plumbing work done under a plumbing permit.

How can you make a basement livable without finishing it?

Start with dry and bright. Clean the gutters, extend downspouts and grade soil away from the house, then run a dehumidifier through the humid months. Paint the walls and ceiling joists a light color, put area rugs on the slab, and use stand-alone shelving so nothing is fastened to damp concrete. More light helps most; new fixtures or outlets are done by a licensed electrician under an electrical permit. Leaving the walls open also lets you keep an eye on the foundation.

How do you finance finishing a basement?

Through a lender you choose, usually with savings, a home equity loan or line of credit, or a renovation mortgage. HUD's 203(k) program insures mortgages that combine buying or refinancing a home with its rehabilitation, and it lists finished attics and basements among eligible improvements; the renovation money sits in escrow and is released when the work is completed (HUD). A home equity loan or HELOC borrows against your equity as a second mortgage (CFPB). Your flat written quote gives the lender the scope it will ask for.

What does finishing a basement entail?

Turning bare concrete into heated, lit, inspected living space. The work runs in order: prove the basement stays dry and test for radon (MDH), plan around the mechanicals, get permits, insulate the foundation walls, frame, rough in wiring, plumbing and ductwork, pass inspections, then drywall, flooring, trim and final inspections. Duluth treats a basement finish like an attic finish, with a code-compliant stairway, headroom and a window for light, ventilation and egress (City of Duluth). New wiring is done by a licensed electrician under an electrical permit.

Should you test for asbestos before finishing an older basement?

Yes, if the work will disturb materials that might contain it. The Minnesota Department of Health lists pipes, insulation, heating system products, flooring and ceiling products among asbestos materials in homes, says material in good condition that isn't disturbed won't release fibers, and says a Minnesota-certified asbestos inspector has to sample it to confirm (MDH). We don't remove asbestos: suspected material is tested and handled by a licensed abatement firm before our work touches it, then the finish goes ahead.

How can I tell if my basement is dry enough to finish?

Watch it through a heavy rain and a spring thaw before you commit. Puddles, damp stains, white chalky deposits on the concrete and a musty smell all mean water is getting in. For a closer look, tape a square of plastic sheeting to the wall for a couple of days: moisture under the plastic is coming through the concrete, while moisture on top is humid room air condensing. Solve either one before the walls go up.

These answers also sit in the Basement Finishing section of our FAQ, alongside questions on pricing, scheduling and coverage.

Our Service Area: Towns and Neighborhoods

The same basement finishing service covers every town listed here, from the Twin Ports out to the small communities beyond.

Duluth neighborhoods:

Superior neighborhoods:

Outside these cities? The surrounding town notes list the other communities we serve for basement finishing work, and the Minnesota and Wisconsin town guides have a project checklist for each. The cost guide and pricing page cover budget and the quote process.

Town checklists for basement finishing projects

Project notes for towns across the service area:

Plan a Basement You'll Actually Use

Call or text photos of your basement and a note on what you want it to become, and we'll plan the work with you and send a firm written quote.

Call Text Get a Quote